Superb Access Solutions Sdn Bhd
13 & 15, Jalan Gitar 33/3,
Seksyen 33,
40350 Shah Alam,
Selangor, Malaysia.
+603-5131 5112
+6016-920 7687
+6019-367 2379 (Chris Chin)
+6016-920 7687
+6019-367 2379 (Chris Chin)
+603-5131 1958
Boiler System
Full Boiler Maintenance Access Systems. We specialise in the design, production, distribution and installation of customised access aluminium systems and platforms for the power industry to facilitate maintenance, cleaning and inspections inside and outside the boiler.
Our unique boiler access system aptly branded Quick Erect Boiler Access System is constructed from lightweight aluminium and is up to 80 % lighter than traditional steel scaffold providing ultimate speed during assemble and dismantle, saving on both labour and downtime – a full system in a 500 mw power plant can be erected in as little as 30 hours. With fewer components to handle, downtime, labour and transport costs are also significantly reduced given a higher return on investment.
The Quick-Erect Boiler Access Systems are erected using a combination of two Instant UpRight basic components – Snap Out and Spandeck.
Snap-Out
The biggest challenge scaffolders face when working inside the power station boiler is getting the equipment to fit through confined spaces such as manholes and traditional scaffold frames are difficult to handle and time consuming to pass through these manholes. This job is made easy with our Snap-Out`s.
Snap-Out offers an unbeatable solution to access within enclosed or restricted access areas. The Instant Snap-Out is made up of lightweight sections weighing less than 40 kg. Each compact section unfolds from an easily managed bundle which will pass through an aperture of 36 cms. Once inside the boiler the Snap-Out units can be instantly erected to provide a complete level of scaffold, 2m cube modules which interlock positively together to provide the main tower structures. There are no loose parts and no tools, nuts or bolts are required for assembly. This unique folding system with no loose components prevents loss and incorrect assembly. The base structure is designed to sit firmly inside the V hopper providing a rigid foundation for the complete upper structure. Ladders, platforms and toeboards are fitted within each module for access at all levels.
Further levels are handled in exactly the same manner, building a tower to the height required which can be up to 100 metres.
Spandeck
Spandeck is a lightweight aluminium walkway and decking system spanning up to 7.4m and provides a safe work platform between Snap-Out towers. It can be repositioned easily at 1m height intervals for complete access at all points throughout the boiler. Its unique reversible design and double sided hooks allow it to be used individually as a catwalk or side by side.
This Modular Walkway System provides the simple, cost – effective and safe solution to high level access requirements. Installation is quick and simple. Spandeck Walkways are designed specifically to give you higher performance than traditional site-fabricated products.
The Quick Erect Boiler Access System offers the Power Sector
As pioneers of the first ever alloy tower in 1947, our design engineers are the most experienced in their field and have perfected the Instant access tower systems providing safe, efficient, improved efficiency and innovative access solutions for the power generation industry. In use in power plants worldwide, the system is designed with a minimum safety factor of 4 and complies with International safety standards.
And that’s not all, our team of design engineers are at your disposable from design through to installation. They work with you to provide full site surveys, on-site training and technical guidance throughout the project.
| |||
Boiler System 1 - Scaffolding | Boiler System 2 - Scaffolding | Boiler System 3 - Scaffolding | Boiler System 4 - Scaffolding |